Product Description
Introduction of Free Shipping Concrete Machinery Portable Mobile Diesel Electric Trailer Mounted Mini Concrete Conveying Pumping Machine Cement Transfer Pump
The construction site fine stone mortar pump is applied in high-rise building ash mortar and fine stone concrete transportation, secondary structure column grouting, reservoir, hydropower station, port, dock, various pressure grouting, foundation treatment, weak foundation, reinforcement grouting, tunnel Backfill grouting anchor support in subway and mine construction. Other descriptions This product adopts hydraulic feeding, and the double-cylinder reciprocating operation of vibrating net filter can completely transport various mortars, fine stone concrete, etc. in building application. This product has large displacement, high pressure, labor saving, flexible movement, etc. Features, is an ideal mortar conveying equipment. The pump is widely used in indoor construction of urban construction projects (such as infusion of structural columns and invisible columns), anchorage grouting, consolidation grouting and backfill grouting works for underground tunnels of urban subway hydropower stations. It can also be used for grouting of anchor piles during slope and soft rock reinforcement.
Parameters of Free Shipping Concrete Machinery Portable Mobile Diesel Electric Trailer Mounted Mini Concrete Conveying Pumping Machine Cement Transfer Pump
Project Unit HBTS25 HBTS40 HBTS60 HBTS80
Maximum theoretical delivery m³/h 23 40 60 80
Maximum outlet pressure Mpa 8 13 13 13-16
Maximum theoretical transport distance m 100/300 200/800 240/1100 240/1100
Motor Power kw 30 55 90 90-110
Feeding height mm 1200 1200 1350 1350
Pumpable concrete maximum particle size mm ≤50 ≤40 ≤40 ≤40
Most suitable for pumping concrete slump cm 15-23 15-23 15-23 15-23
Duct inner diameter mm Φ125 Φ125 Φ125 Φ125
Host weight Kg 1900 3400 5000 5600
ADVANTAGES AND CHARACTERISTICS OF 62 MATER CONCRETE PUMP TRUCK
Worry free annual registration inspection:
The vehicle weight and front and rear axle loads comply with regulations, making it easy to register;
Large displacement:
With a large capacity hopper and a pumping system with a golden inclination angle, the suction performance can reach 95%, and the maximum displacement can reach 180m3/h;
High pressure:
The pump outlet pressure is greater than 12MPa, the direction change is strong, it can eat coarse grains, and the probability of pipe blockage is reduced by 50%;
Energy saving:
The two core energy-saving technologies of engine power self matching and casting energy-saving valve groups reduce pressure loss by more than 25%;
High intelligence:
Intelligent arm frame 2.0, safer and more convenient construction; More than 200 fault self diagnosis functions have reduced troubleshooting time by over 70%;
Small turning radius:
The load-bearing capacity of the five bridges, the body length of the four bridges, the turning radius, vehicle length, and leg span are the same as the classic four bridges of 62 meters;
Specialized integrated chassis:
600L large fuel tank, with a 50% increase in endurance; 630mm wide oversized sleeper for more comfortable rest.
Product Parameters
NO |
ITEMS |
NO |
ITEMS |
1 |
Boom Assembly |
6 |
PTO |
2 |
The Upper Support |
7 |
Electrical Assembly |
3 |
Frame |
8 |
Hydraulic System |
4 |
Pumping System |
9 |
Pneumatic System |
5 |
Outrigger Assembly |
10 |
Chassis |
FAQ
HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS/FACTORIES?
We work as the leading dealers of various leading China construction machinery manufacturers/factories, and are constantly treated with best dealership price. From numerous comparison and feedbacks from clients, our price is more competitive than the price from manufacturers/factories.
HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/factories, it will take more than 30 days to produce the ordered machine.
WHICH PAYMENT TERMS CAN YOU ACCEPT?
Normally we can work on T/T term or L/C term. sometimes DP term.
(1)On T/T term,30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of original B/L for long-term cooperation client.
(2)On L/C term ,a 100% irrevocable L/C without "soft clauses" from an international recognized bank can be accepted. Please seek the advice from the individual sales manager whom you work with.
Packaging & Shipping
